INDUSTRY SOLUTIONS
Funding Built for Concrete, Excavation & Sitework Contractors
You haul the iron to the site, burn the diesel, set up the job, and make the first payrolls, well before the capped mobilization money clears and the surveyed quantities get paid. We give sitework contractors fast, flexible working capital so mobilizing a new job, or carrying a frozen winter, never comes down to what's in the bank today.
Soft credit pull, won't affect your score. No obligation.
Funding Amounts
$10,000 – $500,000
Approval Speed
4 – 8 hours
Credit
All credit profiles considered
Use
Mobilization, fuel, payroll, equipment & more
THE CHALLENGE
Paid on Surveyed Earth, After You've Already Spent It
Concrete, excavation, and sitework is a capital-intensive business with a punishing cash-flow shape: the work IS the iron, the iron runs on diesel, and you front the mobilization, fuel, and payroll long before any of it pays out. In the Federal Reserve's Small Business Credit Survey, the most common reason firms seek financing is simply to meet operating expenses (56 percent). For a sitework contractor that gap has a very specific shape. Here's where the cash gets stuck.
The mobilization money is capped, your mobilization spend is not
Sitework is unusual among construction trades in that public and DOT jobs do pay a separate up-front mobilization bid item, so "we get paid early" sounds true. The catch is that the money is capped and partly held back. Federal and state DOT practice limits mobilization to roughly 10 to 11 percent of the contract, and any amount over about 10 percent is withheld until the project is accepted (FHWA Western Federal Lands estimating handbook). Meanwhile your real mobilization spend, lowboy hauling excavators and dozers to a raw, often remote site, temporary access roads, erosion and sediment control, dewatering, job trailers, and the first weeks of crew payroll, lands before that capped, partially-deferred payment arrives. The gap between the cap and what you actually spend is real cash out of your account.
You're paid on surveyed quantities, so payment lags every yard moved
Earthwork is typically paid by measured in-place quantities, the cubic yards excavated or placed, linear feet of pipe, or square yards paved, verified by survey. Payment therefore lags the physical work, and you finance every yard moved until it's measured and approved. The federal Prompt Payment Act for construction sets the timing, the government pays the prime within 14 days of a progress-payment invoice and final payment within 30 days of acceptance, and the prime then has 7 days to pay each lower tier (FAR 52.232-27), but in practice subs still wait weeks, and retainage of commonly 5 to 10 percent is held until the whole job is accepted, which can be months after your earthwork is done.
The fleet and the fuel are the business, and they don't wait
This is the most equipment-intensive construction segment: excavators, loaders, dozers, graders, off-road trucks, ready-mix and pump trucks, compactors. That fleet runs on diesel, a volatile per-hour cost you eat before getting paid for moved yardage, and it's run by scarce, well-paid people, construction equipment operators earned a median of $58,320 in 2024, with about 46,200 openings a year (Bureau of Labor Statistics). A six-figure machine sitting down for a part or a down payment is idle, high-cost crew, and a down or undersized fleet directly caps the revenue you can bill. The high fixed cost of iron is exactly what makes idle time and stalled jobs so expensive.
When the ground freezes, revenue stops but the costs don't
Sitework is acutely weather-gated. In northern climates, cold weather frequently limits construction in winter, and the work can be seasonal in areas of extreme cold (Bureau of Labor Statistics), because freezing ground halts grading and pours, fresh concrete exposed to cold in its first 24 hours can lose roughly half its strength (established cold-weather concrete engineering guidance). A frozen month is a revenue-zero month while equipment notes, insurance, and a retained core crew keep running. Then spring re-mobilizing, re-fueling, and re-staffing all cost money before the season's billings land.
Moving iron to a new site, replacing a down machine, floating payroll while a progress payment sits behind a survey: these are this-week problems, and an SBA loan is a 30-to-90-day process that often delivers less than the amount requested. Our working capital answers on the job's timeline, funded in days and matched to how a sitework contractor actually gets paid.
How Sitework Contractors Use Our Funding
Mobilize a New Job
Cover the lowboy hauling of excavators and dozers to a remote site, temporary access roads, erosion control, dewatering, job trailers, and the first weeks of payroll, before the mobilization payment clears.
Bridge Surveyed-Quantity Draws
Carry payroll, fuel, and suppliers while you wait to be paid on measured in-place quantities, the cubic yards moved or pipe placed that get surveyed and approved after the work is done.
Buy or Add Equipment
Finance excavators, loaders, dozers, graders, off-road trucks, ready-mix or pump trucks, with terms that spread the cost and the machine itself serving as collateral.
Fund a Down or Stalled Machine
Cover a major repair or a down payment on a replacement machine that's holding up a job, so an idle, high-cost crew isn't waiting on a part.
Front Fuel & Materials
Keep diesel in the fleet and ready-mix, aggregate, and pipe on the job, the costs you eat by the hour and the yard before the moved earth is measured and paid.
Carry the Frozen Season
Keep equipment notes, insurance, and a retained core crew covered through a winter stretch when freezing ground halts pours and grading, then re-mobilize for spring.
One Application. We Match You to the Funding That Fits.
Most sitework contractors we fund use working capital they can put toward anything. You don't need to know which product you want, apply once and we'll match you to what you qualify for.
Working Capital
Flexible funding for mobilization, fuel, payroll, or a slow winter month. Put it toward whatever the next job needs. This is where most sitework contractors start.
Learn MoreEquipment Financing
For excavators, loaders, dozers, graders, off-road and ready-mix trucks, with terms up to 60 months and the machine itself serving as collateral. Often the primary funding event on an iron-heavy job.
Learn MoreBusiness Line of Credit
Revolving cash you draw on to mobilize a job, then repay when the payment clears. Built for the draw-now, repay-when-paid cycle and the seasonal swing. Interest applies only to what you use.
Learn MoreAR & Invoice Factoring
Advance the cash tied up in progress-payment invoices on a completed phase, so you're not floating payroll and fuel while a draw works through net terms.
Learn MoreSBA Loans
Government-backed funding with longer terms and competitive rates for a yard, a facility, or long-term growth, when you have time for a more involved process.
Learn MoreRevenue-Based Financing
Funding with repayment that flexes with your billings, easing off through a slow or frozen winter instead of holding a fixed payment.
Learn MoreWhy Sitework Contractors Choose Us
We've funded contractors across the construction spectrum, from single-machine operators to multi-crew sitework outfits running excavation, grading, and concrete on public and private jobs at the same time. We know your money goes out to mobilize and fuel the iron before the survey gets measured and the draw clears.
Working capital is built for that reality. We're familiar with the capped mobilization gap, the wait on surveyed-quantity payments and retainage, and what it takes to keep a fleet running and a crew on through a slow or frozen season, without floating it all yourself.
See What You Qualify For- We understand mobilization, surveyed-quantity, and retainage timing
- Funding fast enough to move iron to a site on short notice
- Equipment financing for the heavy machinery that IS the business
- A line of credit you draw to mobilize and repay when paid
- Approval in 4 – 8 hours, not weeks
- All credit profiles considered
Simple Requirements to Get Started
If your sitework business has been operating for at least 6 months and generates $10,000 or more in monthly revenue, you're likely a fit.
6+ Months
In Business
$10K+
Monthly Revenue
All Credit
Profiles Welcome
See What You Qualify For
It takes less than 30 seconds. Soft credit pull, won't affect your score.
Concrete & Excavation Funding FAQs
Can I get funded to mobilize a new sitework job before the mobilization payment comes in?
Yes, this is the most common reason sitework contractors come to us. On public and DOT jobs, the separate mobilization pay item is capped at roughly 10 to 11 percent of the contract, and the amount above about 10 percent is withheld until the project is accepted (FHWA). Meanwhile your real mobilization spend, the lowboy hauling of excavators and dozers to the site, temporary access roads, erosion and sediment control, dewatering, job trailers, and the first weeks of payroll, all lands before that capped payment arrives. Working capital advances you the cash now to mobilize, and you repay as the job pays out.
How fast can I get working capital to move equipment to a job site?
Approval typically comes within 4 to 8 hours, with funds following shortly after. That speed is the main reason sitework contractors choose us over a bank or an SBA loan, where the same request can take 30 to 90 days, long after the mobilization window has passed.
Do you offer equipment financing for excavators, loaders, and dozers, and can the equipment itself serve as collateral?
Yes. Concrete, excavation, and sitework is the most equipment-intensive construction segment, the machine is the revenue engine, so equipment financing is a primary tool here, not a footnote. It's available with terms up to roughly 60 months, and the equipment itself usually serves as collateral, which often makes approval easier. It fits excavators, loaders, dozers, graders, off-road trucks, and ready-mix and pump trucks.
Can you fund a down payment or a major repair on a machine that's holding up a job?
Yes. A stalled or undersized machine is idle, high-cost crew waiting on a part or a payment, and a down fleet directly caps your revenue. Working capital or equipment financing can cover a major repair or a down payment on a replacement, so the iron is back on the job instead of sitting in the yard.
Will retainage being held on my completed earthwork affect whether I qualify?
No. Held retainage doesn't disqualify you. Retainage is commonly 5 to 10 percent, with statutory caps that vary by state, for example California caps retention at 5 percent on public works and Texas caps it at 10 percent on public works under $5 million (5 percent at or above), and it's released only when the whole job is accepted, often months after your earthwork is done. We base funding on your monthly revenue and time in business, not on a perfect balance sheet, so money tied up in retainage is exactly the kind of gap working capital is meant to bridge.
Do you fund contractors on public or DOT jobs that pay on surveyed in-place quantities?
Yes. Earthwork is typically paid by measured in-place quantities, the cubic yards excavated or placed, linear feet of pipe, or square yards paved, verified by survey, so payment lags the physical work and you finance every yard moved until it's measured and approved. Under the federal Prompt Payment Act for construction, the government pays the prime within 14 days of a progress-payment invoice and final payment within 30 days of acceptance, and the prime then has 7 days to pay each lower tier (FAR 52.232-27), but subs still wait in practice. Working capital and a line of credit carry you through that survey-and-approval lag.
Can I get a line of credit to cover the gap between mobilizing and getting paid, then repay when the draw clears?
Yes. A business line of credit is a good fit for the revolving mobilization-to-payment cycle. You draw on it to mobilize, fuel up, and make payroll, then repay as the progress payment or mobilization money lands, and you only pay interest on what you actually use. It also smooths the seasonal swing between a busy build season and a slow or frozen winter.
How do I cover payroll and equipment notes through a slow or frozen winter season?
Sitework is strongly seasonal in cold climates: in northern areas, freezing temperatures limit construction in winter, and fresh concrete exposed to cold in its first 24 hours can lose roughly half its strength (cold-weather concrete engineering guidance), so winter can be a low- or no-revenue stretch. Meanwhile equipment notes, insurance, and a retained core crew keep running every month. Working capital or a line of credit carries those fixed costs through the quiet stretch and funds the spring re-mobilization, before the season's billings land.
Do you consider all credit profiles for sitework contractors, or do you require perfect credit?
All credit profiles are considered. Most sitework contractors we fund have been operating for at least 6 months and generate $10,000 or more in monthly revenue. Your billings and day-to-day performance matter more than a perfect credit score.
Can you help with the cash behind a bond premium even though you don't issue bonds?
Yes, with an important distinction. We do not issue surety bonds, that's the surety's role, but we can fund the operating cash that a bond premium and the job behind it require. Think of it as funding the cash flow behind the bond, not underwriting the bond itself.
Do you provide construction loans or financing to buy land or property?
No, and this is an honest boundary worth being clear about. Monera funds your business operating cash, mobilization, fuel, payroll, materials, and equipment, not the project's permanent financing or the property itself. We are not a construction-loan, project-finance, real-estate or land-acquisition, hard-money, or floor-plan funding partner, and we don't issue bonds. Sitework contractors get pitched 'construction financing' constantly, which usually means project or real-estate loans or surety bonding, products we don't offer. We fund the operating-cash gaps those other products don't cover.
What documents do I need to apply, and does applying affect my credit score?
Applying is quick and checking what you qualify for uses a soft credit pull that won't affect your score, with no obligation to move forward. Most contractors apply with a simple application and a few months of recent business bank statements. You don't have to choose a product up front, you apply once and we match you to the funding you qualify for.
Specialized Funding
Other Business Types We Fund
We build dedicated funding guides for specific business types. Explore others below, or see the full Construction overview.
Insights
Reading for Construction Owners
Is It a Cash Flow Problem or a Business Problem?
A low bank account does not always mean a failing business. How to tell a timing gap you can fund from a pricing problem you have to fix first.
Read Essay
Contractor Cash Flow in a Stop-and-Go Housing Market
Housing starts fell 15.4% in May, jumped 19.0% in June, then fell 12.4% in July. Why contractors should plan cash flow for the swings, not a trend.
Read Article
What the Fed's Rate Hold Means for Small Business Funding
Three Fed officials voted to raise rates in July. None voted to cut. How the vote and new bank-lending data should shape funding a business this fall.
Read Article